Waste management

 

Waste management enterprise pursuant to §§ 56 and 57, Waste Management Act (KrWG)


Residual waste volume (100% load)4 x 22 t/h
Residual waste volume per year650,000 t
Total investment250 million Euros
Supplier/general contractorAE&E Inova GmbH
(formerly Alstom Power Boiler GmbH)
Waste bunker2 x 12,000m³; (2 x 6,000 t)
2 deep bunkers with 6 dumping stations each
4 gantry cranes with hydraulic grippers
Boilers4-step natural circulation boiler
vertical with drum
heating surface 7,130m² each
steam quantity 77.6 t/h each
Turbine2 extraction condensing turbines
2 x 33.6 MW gross output
Grate4 units each 9.7m long and 6.9m wide
water- and air-cooled feed grate